Project #1
1. Date: June 1999
2. Project Duration: 7 Days
3. Client: Santa Fe Oil Company
4. Project Description: Blowout Preventer Guide Frame Removal from Seabed well and Salvage it out of Water
5. Location: South China Sea Panyu Oil Field
6. Maximum Water Depth: 96m
7. Personnel: 12
8 Diving Equipment: KMB18 Mask
9. Position: Diving Superintend: Mr. Xu Gen Di
Diving Supervisor: Mr. Xu Guo Liang
|
|
|
10. Dive times: 2
11. Gas used: Helium-Oxygen Mixed Gas, Oxygen, Air
Ratio of Mixed Gas: 86% Helium and 14 % Oxygen, 50% Helium and 50 % Oxygen.
12. Completion of Project: Successfully.
13. Remark: Although this project did not belong to DIV experience, the management experience obtained from this project by main management person based mixed gas diving development of DIV. |
|
|
|
Project #2
1. Date: April 2002
2. Project Duration: 21 Days
3. Client: Wenchang 13-1/13-2 Platform
4. Project Description: Installation of 63 Wedges for 21 oil wells ( 65kg per each wedge)
5. Location: Wenchang 13-1/13-2 Platform
6. Maximum Water Depth: 82m
7. Personnel: 13
8 Diving Equipment: KMB18 Mask
9. Position: Diving Superintend: Mr. Xu Guo Liang
Diving Supervisor: Mr. Xiong Wen Hai
10. Dive times: 23
11. Gas used: Helium-Oxygen Mixed Gas, Oxygen, Air
Ratio of Mixed Gas: 84% Helium and 16 % Oxygen
12. Completion of Project: Successfully. |
 |
|
|
|
Project #3
1. Date: August ¨C September 2005
2. Project Duration: 30 Days
3. Client: ConocoPhillips China Inc.
4. Project Description: Installation of 24 Conductor Guides for 6 well Slot of 4 Levels ( 2.2tonnes per each Guide)
5. Location: Xijiang30-2 Platform
6. Maximum Water Depth: 75m
7. Personnel: 18
8 Diving Equipment: KMB18 Mask
9. Position: Diving Superintend: Mr. Xu Guo Liang
Diving Supervisor: Mr. Xiong Wen Hai
10. Dive times: 35
11. Gas used: Helium-Oxygen Mixed Gas, Oxygen, Air
Ratio of Mixed Gas: 82% Helium and 18 % Oxygen, 80% Helium and 20 % Oxygen
12. Completion of Project: Successfully. |
|
|
 | |
| ¡¡ |
|
¡¡ |
|
¡¡ |
|
 |
Project #4
1. Date: August ¨C October 2006
2. Project Duration: 38 Days
3. Client: ConocoPhillips China Inc.
4. Project Description: Installation of 24 Conductor Guides for 6 well Slot of 4 Levels ( 2.2tonnes per each Guide)
5. Location: Xijiang24-3 Platform
6. Maximum Water Depth: 75m
7. Personnel: 16
8 Diving Equipment: KMB18 Mask
9. Position: Diving Superintend: Mr. Xu Guo Liang
Diving Supervisor: Mr. Gu Jiang Hong
10. Dive times: 39
11. Gas used: Helium-Oxygen Mixed Gas, Oxygen, Air
Ratio of Mixed Gas: 82% Helium and 18 % Oxygen, 80% Helium and 20 % Oxygen
12. Completion of Project: Successfully. |
|
|
Project #5
1. Date: September 2006
2. Project Duration: 6 Days
3. Client: ConocoPhillips China Inc.
4. Project Description: Inspection of Mooring Leg for FPSO NanHaiFaXian Sample Damaged Strands
5. Location: Xijiang Oil Field NanHaiFaXiang FPSO
6. Maximum Water Depth: 82m
7. Personnel: 16
8 Diving Equipment: KMB18 Mask
9. Position: Diving Superintend: Mr. Xu Guo Liang
Diving Supervisor: Mr. Gu Jiang Hong
10. Dive times: 6
11. Gas used: Helium-Oxygen Mixed Gas, Oxygen, Air
Ratio of Mixed Gas: 84% Helium and 16 % Oxygen
12. Completion of Project: Successfully. |
|
|
 |
|
| ¡¡ |
|
¡¡ |
|
¡¡ |
|
Project #6
1. Date: April 2007
2. Project Duration: 18 Days
3. Client: CACT Operators Group
4. Project Description: HZ26-1 Platform Leaking Pipe Replacement
5. Location: HZ26-1 Platform
6. Maximum Water Depth: 75m
7. Personnel: 16
8 Diving Equipment: KM37 Helmet
9. Position: Diving Superintend: Mr. Xu Guo Liang
Diving Supervisor: Mr. Gu Jiang Hong
10. Dive times: 29
11. Gas used: Helium-Oxygen Mixed Gas, Oxygen, Air
Ratio of Mixed Gas: 84% Helium and 16 % Oxygen
12. Completion of Project: Successfully. |
|
|
 |
|