|
1 |
2008.01.04-01.07 |
4 |
Marine Growth Removal Services for HONGTAI ship |
Beihai, Guangxi |
|
0-6m |
597min |
|
|
2 |
2008.01.04 |
1 |
Xi Keng Reservior water-gate Clearing Services, Shenzhen. |
Xi Keng, Shenzhen. |
|
0-7m |
47min |
|
|
3 |
2008.01.05 |
1 |
Propeller Inspection Services for "JinHangjun 118" |
MaWan Haven |
|
0-5m |
51min |
|
|
4 |
2008.01.11 |
1 |
Propeller Clearing Services for #27 Yiulian ship |
Yiu Lian Dockyard (Shekou) Limited. |
|
0-3m |
90min |
|
|
5 |
2008.01.12-01.13 |
2 |
Outlet Closure Services |
Heyuan, Guangdong. |
|
0-7m |
258min |
|
|
6 |
2008.02.25 |
1 |
Propeller Visual Inspection Services of "Junhe" Ship |
SCT Haven |
|
0-5m |
10min |
|
|
7 |
2008.03.06-03.08 |
3 |
Video Inspection Service for "Yuanzhongshangong 4020" |
Basuo Habor, HainanBasuo Habor, Hainan |
|
0-5m |
140min |
|
|
8 |
2008.04.11-2008.04.12 |
1 |
|
|
|
5M |
|
|
|
9 |
2008.04.20-2008.05.06 |
16 |
Xijiang BTM mooring legs back-up rope installation |
Xijiang Offshore Oil Field |
ConocoPhillips China Inc |
86 |
|
|
|
10 |
2008.05.04 |
1 |
|
|
|
14 |
|
|
|
11 |
2008.05.09-2008.05.24 |
15 |
Marine diving and ROV services for 2008 Xijiang subsea inspection |
Xijiang Offshore Oil Field |
ConocoPhillips China Inc |
25 |
|
|
|
12 |
2008.05.09-2008.05.24 |
15 |
CACT HZ26-1 Broken Caisson Salvaging |
Huizhou26-1 Platform |
CNOOC-Agip-Chevron-Texaco Operation Group |
12 |
|
|
|
13 |
2008.05.09-2008.05.10 |
1 |
|
|
|
5 |
|
|
|
13 |
2008.05.29 |
6 |
Connecting the rope to the Marine Hose |
Liuhua Oil Field, South China Sea |
|
17 |
|
|
|
14 |
2008.06.01 |
3 |
|
|
|
5m |
|
|
|
14 |
2008.05.20 |
1 |
|
|
|
5 |
|
|
|
15 |
2008.06.09 |
1 |
|
|
|
5m |
|
|
|
16 |
2008.06.10 |
5 |
|
|
|
11m |
|
|
|
17 |
2008.06.18 |
1 |
|
|
|
13m |
|
|
|
18 |
2008.06.25 |
1 |
|
|
|
|
|
|