Client:GD LNG
Duration:November to December 2015
Vessels:/
Depth:120M
Manners: ROV, ARV
Key points:
• Underwaternature gas pipeline inspection
• Underwatertunnel inspection
• Longdistance with small diameter
• 130.53 hrsROV diving time and 42.5 hrs ARV diving time